Changes for page 3. Metering Channels

Last modified by Iaroslav Platonov on 2026/06/08 09:57

From version 22.4
edited by Lana
on 2025/11/28 09:58
Change comment: There is no comment for this version
To version 21.2
edited by Lana
on 2025/11/27 22:06
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,4 +1,4 @@
1 -== CONTENT ==
1 +CONTENT
2 2  
3 3  
4 4  == 1. INTRODUCTION ==
... ... @@ -21,51 +21,51 @@
21 21  
22 22  Setting up the E/E metering protocol contains the following fields:
23 23  
24 -[[image:Screenshot 2025-11-27 at 18.56.14.png||height="63" width="404"]]
24 +[[image:Screenshot 2025-11-27 at 18.56.14.png]]
25 25  
26 26  Selection of the accounting protocol from the drop-down list and its inclusion in the survey.
27 27  
28 -[[image:Screenshot 2025-11-27 at 18.56.53.png||height="112" width="404"]]
28 +[[image:Screenshot 2025-11-27 at 18.56.53.png]]
29 29  
30 30  Setting up a poll according to the Cron rule (there can be several) with set attempts and timeouts.
31 31  
32 -[[image:Screenshot 2025-11-27 at 18.57.26.png||height="146" width="408"]]
32 +[[image:Screenshot 2025-11-27 at 18.57.26.png]]
33 33  
34 34  Specifying the network address of the device and the port for the TCP connection.
35 35  
36 -[[image:Screenshot 2025-11-27 at 18.57.54.png||height="96" width="93"]]
36 +[[image:Screenshot 2025-11-27 at 18.57.54.png]]
37 37  
38 38  Serial number of the E/E metering data file in the device's memory (for devices of the Satec type).
39 39  
40 -[[image:Screenshot 2025-11-27 at 18.58.26.png||height="120" width="216"]]
40 +[[image:Screenshot 2025-11-27 at 18.58.26.png]]
41 41  
42 42  Device administrator password.
43 43  
44 -[[image:Screenshot 2025-11-27 at 18.58.55.png||height="114" width="406"]]
44 +[[image:Screenshot 2025-11-27 at 18.58.55.png]]
45 45  
46 46  Coefficients of conversion of interval values of readings/power (depends on the type of metering device, as well as on the type of connection (direct or with measuring transformers).
47 47  
48 -[[image:Screenshot 2025-11-27 at 18.59.34.png||height="106" width="410"]]
48 +[[image:Screenshot 2025-11-27 at 18.59.34.png]]
49 49  
50 50  Transformation coefficients of current and voltage transformers, meter coefficient.
51 51  
52 -[[image:Screenshot 2025-11-27 at 19.00.09.png||height="88" width="217"]]
52 +[[image:Screenshot 2025-11-27 at 19.00.09.png]]
53 53  
54 54  Specifying the TCP connection number for parallel polling of one device (for example, if the device is connected via a Modbus TCP/Modbus RTU converter, then the number of the trunk to which the device is connected is specified).
55 55  
56 -[[image:Screenshot 2025-11-27 at 19.00.46.png||height="77" width="216"]]
56 +[[image:Screenshot 2025-11-27 at 19.00.46.png]]
57 57  
58 58  Selection of energy/power profile.
59 59  
60 -[[image:Screenshot 2025-11-27 at 19.01.19.png||height="152" width="406"]]
60 +[[image:Screenshot 2025-11-27 at 19.01.19.png]]
61 61  
62 62  Enabling/disabling the time synchronization of the device on the CENTO side, with the configured period of maximum time correction in seconds, as well as the permissible deviation.
63 63  
64 -[[image:Screenshot 2025-11-27 at 19.01.49.png||height="240" width="133"]]
64 +[[image:Screenshot 2025-11-27 at 19.01.49.png]]
65 65  
66 66  Enabling/disabling a particular channel.
67 67  
68 -[[image:Screenshot 2025-11-27 at 19.02.20.png||height="94" width="393"]]
68 +[[image:Screenshot 2025-11-27 at 19.02.20.png]]
69 69  
70 70  Serial number of the record (metering channel) in the E/E metering data file in the device's memory (for devices of the Satec type).
71 71  
... ... @@ -93,12 +93,4 @@
93 93  
94 94  Clicking on the channel name or its ID, redirects to the **Device editing: editing** page, as shown in Fig. 2.1.
95 95  
96 -The forms for filling in the fields for setting up electricity metering protocols are different and depend on the type/model of the device, instructions for working with the protocols can be described in different manuals and, if necessary, provided to the User.
97 -
98 -== 3. ENERGY METERING (COMING) ==
99 -
100 -=== 3.1. Device Setup (Coming) ===
101 -
102 -== 4. OTHER TYPES OF METERING ==
103 -
104 -
96 +The forms for filling in the fields for setting up electricity metering protocols are different and depend on the type/model of the device, instructions for working with the protocols can be described in different manuals and, if necessary, provided to the User