Changes for page 3. Metering Channels

Last modified by Iaroslav Platonov on 2026/06/08 09:57

From version 22.2
edited by Lana
on 2025/11/28 09:56
Change comment: There is no comment for this version
To version 23.1
edited by Lana
on 2025/11/28 09:59
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -21,7 +21,7 @@
21 21  
22 22  Setting up the E/E metering protocol contains the following fields:
23 23  
24 -[[image:Screenshot 2025-11-27 at 18.56.14.png||height="63" width="402"]]
24 +[[image:Screenshot 2025-11-27 at 18.56.14.png||height="63" width="404"]]
25 25  
26 26  Selection of the accounting protocol from the drop-down list and its inclusion in the survey.
27 27  
... ... @@ -41,43 +41,43 @@
41 41  
42 42  Device administrator password.
43 43  
44 -[[image:Screenshot 2025-11-27 at 18.58.55.png||height="115" width="410"]]
44 +[[image:Screenshot 2025-11-27 at 18.58.55.png||height="114" width="406"]]
45 45  
46 46  Coefficients of conversion of interval values of readings/power (depends on the type of metering device, as well as on the type of connection (direct or with measuring transformers).
47 47  
48 -[[image:Screenshot 2025-11-27 at 18.59.34.png]]
48 +[[image:Screenshot 2025-11-27 at 18.59.34.png||height="106" width="410"]]
49 49  
50 50  Transformation coefficients of current and voltage transformers, meter coefficient.
51 51  
52 -[[image:Screenshot 2025-11-27 at 19.00.09.png]]
52 +[[image:Screenshot 2025-11-27 at 19.00.09.png||height="88" width="217"]]
53 53  
54 54  Specifying the TCP connection number for parallel polling of one device (for example, if the device is connected via a Modbus TCP/Modbus RTU converter, then the number of the trunk to which the device is connected is specified).
55 55  
56 -[[image:Screenshot 2025-11-27 at 19.00.46.png]]
56 +[[image:Screenshot 2025-11-27 at 19.00.46.png||height="77" width="216"]]
57 57  
58 58  Selection of energy/power profile.
59 59  
60 -[[image:Screenshot 2025-11-27 at 19.01.19.png]]
60 +[[image:Screenshot 2025-11-27 at 19.01.19.png||height="152" width="406"]]
61 61  
62 62  Enabling/disabling the time synchronization of the device on the CENTO side, with the configured period of maximum time correction in seconds, as well as the permissible deviation.
63 63  
64 -[[image:Screenshot 2025-11-27 at 19.01.49.png]]
64 +[[image:Screenshot 2025-11-27 at 19.01.49.png||height="240" width="133"]]
65 65  
66 66  Enabling/disabling a particular channel.
67 67  
68 -[[image:Screenshot 2025-11-27 at 19.02.20.png]]
68 +[[image:Screenshot 2025-11-27 at 19.02.20.png||height="96" width="403"]]
69 69  
70 70  Serial number of the record (metering channel) in the E/E metering data file in the device's memory (for devices of the Satec type).
71 71  
72 -[[image:Screenshot 2025-11-27 at 19.02.51.png]]
72 +[[image:Screenshot 2025-11-27 at 19.02.51.png||height="142" width="412"]]
73 73  
74 74  When this option is enabled, the specified numbers of energy and power files are not taken into account.
75 75  
76 -[[image:Screenshot 2025-11-27 at 19.03.24.png]]
76 +[[image:Screenshot 2025-11-27 at 19.03.24.png||height="142" width="138"]]
77 77  
78 78  Enabling/disabling reading logs from the device.
79 79  
80 -[[image:Screenshot 2025-11-27 at 19.03.56.png]]
80 +[[image:Screenshot 2025-11-27 at 19.03.56.png||height="291" width="139"]]
81 81  
82 82  Rounding of channels.
83 83